Welcome to the Gemini Community Support Site

This Gemini community support site can be used to find solutions to product issues. You can log in using Open Id, Google Profile and even Facebook. Feel free to ask a question or browse FAQs and documentation. Product tour videos are also available along with how-to videos demonstrating key Gemini capabilities.




Index Document Numbers
Previous  |  Next

 1      Getting Started
 2      Installing
 2.1        Requirements
 2.2        Automated Installer
 2.3        Microsoft Web Platform
 2.4        Zip File
 2.5        Scheduler Service
 3      Upgrading
 3.1        Upgrading Existing Installations
 3.2        Upgrading 4.1.x to 4.2
 3.3        Upgrading 4.0.x to 4.2
 3.4        Upgrading 3.7.x to 4.2
 3.5        Upgrading 3.6.x to 4.2
 3.6        Upgrading 3.5.x to 4.2
 3.7        Upgrading 3.1.x to 4.2
 3.8        Upgrading 3.0.x to 4.2
 3.9        Upgrading 3.0.0 to 4.2
 3.10         Upgrading 2.2 to 4.2
 3.11         Upgrading 2.1.x to 4.2
 3.12         Upgrading 2.0.x to 4.2
 3.13         Upgrading 1.9.1 to 4.2
 3.14         Upgrading 1.9/1.9a/1.9b to 4.2
 3.15         Upgrading 1.8.x to 4.2
 3.16         Upgrading 1.7 to 4.2
 3.17         Upgrading 1.6.3 to 4.2
 4      Projects
 4.1        Project Concepts
 4.1.1          Grouping Projects
 4.1.2          Components
 4.1.3          Versions
 4.1.4          Roadmap
 4.1.5          Change Log
 4.1.6          Dashboard
 4.2        Project Customization
 4.2.1          Project Settings
 4.2.2          Single, Multiple Item Options
 4.2.3          Item Type, Priority, Severity Options
 4.2.4          Default Values
 4.2.5          Components
 4.2.6          Versions
 4.2.7          Project Attributes
 4.2.8          Which Fields Are Displayed?
 5      Item Management
 5.1        Overview
 5.2        Creating
 5.3        Editing
 5.4        Viewing
 5.5        Visibility
 5.6        Custom Fields
 5.7        Comments
 5.8        Hierarchy
 5.9        Links
 5.10         Recurrence
 5.11         Estimates & Time Logs
 5.12         Source Control Links
 5.13         Audit Trails
 5.14         Workflow
 5.15         Filter Items
 5.15.1           Using the Filter
 5.15.2           Saving and Reusing Filters
 5.15.3           Cross Project Roll-ups
 5.16         Patterns
 6      Planning Board
 7      Time Management
 7.1        Time Reports
 7.2        Recording Time
 8      Notifications
 8.1        Project Alerts
 8.2        Item Watchers
 9      Test Management
 9.1        Approach
 9.2        Plans
 9.3        Cases
 9.4        Runs
 9.5        Traceability
 9.6        Filtering
 10       Management
 10.1         Administration
 10.1.1           General Configuration
 10.1.2           SMTP and Notifications
 10.1.3           Projects
 10.1.4           Custom Fields
 10.1.5           Item Management
 10.1.6           Test Management
 10.1.7           Licensing
 10.2         Users & Security
 10.2.1           User Management
 10.2.2           Global and Project Groups
 10.2.3           Working with Global Groups
 10.2.4           Working with Project Groups
 10.2.5           Available Permissions
 10.2.6           Project Resources
 10.2.7           Assigning Permissions to Projects
 10.2.8           Windows Authentication
 10.2.9           Active Directory Integration
 11       Using Add-on Products
 11.1         Visual Studio 2008/2010
 11.2         Gemini Desktop
 11.3         Microsoft Outlook
 11.4         Converse
 11.4.1           Installation
 11.4.2           Core Mailbox Setup
 11.4.3           Selecting Emails to Process
 11.4.4           Manipulating Email Content
 11.4.5           Outbound Notifications
 11.4.6           Project Mapping
 11.5         SimplyFi
 11.5.1           Introduction
 11.5.2           Key Features
 11.5.3           Licensing
 11.5.4           SimplyFi Concepts
 11.5.5           Clients
 11.5.6           Contacts
 11.5.7           Documents
 11.5.8           Payments
 11.5.9           Stock Items
 11.5.10            Payment Terms
 11.5.11            Document Templates
 11.5.12            Email Templates
 11.5.13            Reminders
 11.5.14            Resource Costs
 11.5.15            Project Costs
 11.5.16            Initial Configuration
 11.5.17            Administration
 11.5.18            General
 11.5.19            Stock Items
 11.5.20            Cost Categories
 11.5.21            Resource Costs
 11.5.22            Project Costs
 11.5.23            Document Templates
 11.5.24            Statement Templates
 11.5.25            Email Templates
 11.5.26            Reminders
 11.5.27            Currencies
 11.5.28            FX Rates (Foreign Exchange)
 11.5.29            Tax Codes
 11.5.30            Payment Terms
 11.5.31            Client Custom Fields
 11.5.32            Localisation
 11.5.33            Clients and Contacts
 11.5.34            Clients
 11.5.35            Contacts
 11.5.36            Searching Clients
 11.5.37            Adding a Client
 11.5.38            Editing a Client
 11.5.39            Deleting a Client
 11.5.40            Searching Contacts
 11.5.41            Adding a Contact to an Existing Client
 11.5.42            Editing an Existing Contact
 11.5.43            Deleting an existing Contact
 11.5.44            Contact Groups
 11.5.45            Documents
 11.5.46            Invoices
 11.5.47            Searching Invoices
 11.5.48            Quotes
 11.5.49            Creating and Editing Invoices
 11.5.50            Searching Quotes
 11.5.51            Credit Notes
 11.5.52            Creating and Editing Quotes
 11.5.53            Searching Credit Notes
 11.5.54            Recurring Invoices
 11.5.55            Creating and Editing Credit Notes
 11.5.56            Searching Recurring Invoices
 11.5.57            Creating and Editing Recurring Invoices
 11.5.58            Document Numbers
 11.5.59            Payments
 11.5.60            Searching Payments
 11.5.61            Logging a new payment
 11.5.62            Editing Payments
 11.5.63            Reports
 11.5.64            Age Analysis
 11.5.65            Reconciliation Report (Recon Report)
 11.5.66            Debt Report
 11.5.67            Tax Report
 11.5.68            Finance Summary Panels
 11.5.69            Import
 11.5.70            Clients
 11.5.71            Invoices
 11.5.72            Payments
 11.5.73            Dashboard
 11.5.74            Support
 11.5.75            Reference
 11.5.76            Windows Localisation Codes
 11.5.77            Supported Currencies
 11.5.78            Icon Reference
 11.5.79            Additional Resources
 12       API
 12.1         Introduction
 12.2         Enabling API support
 12.3         Authentication
 12.4         Response Formats
 12.5         .NET Quick-start
 12.6         Schema Reference
 12.7         Administration API
 12.8         Alerts API
 12.9         Custom Fields API
 12.10          Groups API
 12.11          Items API
 12.12          Projects API
 12.13          Users API
 12.14          Testing API
 13       User Profile
View  |  Print  |  PDF

202 documents found.


Document Numbers

simplyfi
add-ons

Document Numbers are a standardised way of tracking sequences of when Invoices, or Quotes or Credit Notes have been issued. Document Numbers in SimplyFi are calculated automatically depending on the Document Type (Invoice, Quote or Credit Note) and the Template selected for the Document.  (e.g. INV-01-1, where “INV” is the Invoice Prefix set in the general settings, “-01-“ is the Document Number Prefix set against the Template that was selected for this Document, and 1 is the next available number in the sequence of Documents created against the same Document Type and Document Template.)

From the screenshot below, we see 3 Invoices in our system. The first has a Document Number of “-“, indicating this Document has not yet been sent to the Client, and therefore has not had a number allocated. The second two Invoices have been issued, so the appropriate Document Numbers are in sequence.

 

image

 

Document Numbers can be manually overridden when editing a Document, by clicking on the  icon next to the Document Number in the Document Edit page to re-generate the Document Number. This will also set the Document Number text box to editable where you can manually override the Document Number if so desired.

 

WARNING: Manually overriding Document Numbers may cause sequencing errors with the automated Document Number generation. Use with care.

 


Previous  |  Next